Retained to complete a large-scale hazardous materials abatement, demolition and site remediation program at the site

client
Woodfibre LNG
client
location
Squamish
Budget
$

As part of the Early Works Program, NC-Matcon JV (JV between the Squamish Nation and Matcon) has been retained to complete a large-scale hazardous materials abatement, demolition and site remediation program at the site involving:

  • Preparation of a site specific HASP & Environmental Protection Plan;
  • Mobilization of all heavy equipment/supplies to the site via barge;
  • Development of Exposure Control Plans to address lead/asbestos contaminated materials;
  • Lead and asbestos abatement and removal of hazardous liquids/items throughout site
  • Demolition and removal of over 75 structures and features throughout site, with all debris and scrap steel barged off-site for disposal;
  • Demolition of several gas, diesel & propane storage tanks and associated infrastructure
  • Demolish and Crush over 15,000 M3 of concrete to 3” minus for re-use onsite. 5000m3 of concrete was hauled to the existing landfill for capping
  • Removal of 9 concrete docks within tidal zone (up to 1500m3) under direction from environmental monitoring