Retained to complete Mechanical and Electrical upgrades to the Wastewater Treatment Plant at the CR Rail South Yard in Prince George. This project was executed during a national pandemic and disruptions to the supply chain for many components was overcome for a successful installation.
Works included but not limited to:
- Demolish redundant system elements and concrete foundations / Housekeeping pads
- Construct equipment concrete housekeeping pads and gangway foundations
- Supply and install Dissolved Air Flotation Tank
- Supply and Install new Oil Water Separator
- Install Inclined Plate Clarifier
- Upgrade Influent chamber oil skimmer system
- Supply and install sludge polymer system
- System power supply and program logic upgrades
- Clean and inspect Influent chambers and AST’s
- Building upgrades
- Clean and Epoxy coating WWTP floors
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreOakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn moreGateway Residences
A demolition, remediation and excavation project all in preperation for development.
Learn more