- Geotechnical engineering by use of native soils.
- Water collection, management and treatment.
- Installation of several hundred meters of watermain, firemain, sanitary, & storm mainline systems incl. all services.
- Installation of all hydrotel works required onsite.
- Excavation and prep work of 56 building pads.
- Installation of a 16-360 water meter chamber.
- Road construction for all road networks within Phase 1 & Phase 2.
- Installation of 7 Stormceptor units.
- Installation of 15 Detention tank units throughout lot perimeter.