  • Bulk/Detail Excavation of 76,800m3
  • Installation of 28,000sf of shotcrete shoring
  • Installation of 16,500sf of 8 inch underpinning
  • Installation of 63,500ft of tieback anchors
  • Detail Backfill and Slab preparation
  • To reach parking level 7 (75 feet deep) a telescopic excavator was required to remove the remaining soil.