A dynamic excavation and shoring effort to prepare for backfill and slab preparation for the Brentwood Town Centre development.
- Bulk/Detail Excavation of 76,800m3
- Installation of 28,000sf of shotcrete shoring
- Installation of 16,500sf of 8 inch underpinning
- Installation of 63,500ft of tieback anchors
- Detail Backfill and Slab preparation
- To reach parking level 7 (75 feet deep) a telescopic excavator was required to remove the remaining soil.
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreSlate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn moreKing George Hub Phase D
Matcon excelled in the excavation and shoring of the King George Hub Phase D project, overcoming challenges posed by the Abbotsford flooding events with a strategic contingency plan for on-time and within-budget delivery.
Learn more