DF
Deep Foundations
ES
Excavation & Shoring

SWEC Whitehead Creek

Retained to aid and assist with the reinforcement and jet grouting of a collapsed coal mine located between 36m and 30m below surface.

client
ATCO Pipelines
client
location
Edmonton
Budget
$

Jet Grouting of a collapsed coal mine located between 36m and 30m below surface:

  • Pre-drilling of 10” reflow conduits 24m deep each
  • Double fluid Jet Grouting of up to 30m3 per hole between 36m and 30m
  • Spoil and reflow management of up to 50m3 per day
  • Working in sub-zero temperatures up to -40 degrees Celsius
  • Working adjacent to 500kV overhead lines
  • Cement Bentonite grout mix for compressive strength control and to minimize bleed.