Retained to handle the disposal of contaminated soil and creosote piles, installation of sheet pile, roof drains, catch basins etc.
- Placement of 150 lm of floating silt curtain to isolate the site.
- Removal of all internal columns and temporary underpinning of the building, including all required structural cross bracing.
- Removal and off-site disposal of ~2000 creosote piles.
- Removal and off-site disposal of contaminated soil.
- Placement and compaction of ~45,000 MT of aggregate within a sheet pile enclosed area in the Fraser River.
- Installation of 150 lm up up-land sheet pile wall in the warehouse and anchors to stabilize the exterior sheet pile wall.
- Forming, re-bar installation and placement of concrete for 45 new column foundations and exterior wall spread footings.
- Placement and field fitting of new steel internal columns.
- Installation of new roof drains, catch basins, and floor drains including connection of the sanitary sewer system.
- Placement of 9000 M2 of concrete floor.
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreOakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn moreGateway Residences
A demolition, remediation and excavation project all in preperation for development.
Learn more