A dynamic project for our environmental division situated along a busy corridor requiring the safe removal of contaminated soil and the destruction and construction of a carpark.
- Commission the excavation and soil retention design
- Temporary re-routing of all utilities within the excavation footprint and temporary removal of light standard
- Excavate to 7m in depth to remove PCE and TCE impacted soils within an operational Safeway carpark
- Excavation, transport and disposal of ~4,300 MT of contaminated soil
- Installation of 3,600 sf shotcrete and shoring
- Drilling and installation of 1,270 lineal ft of soil anchors
- Underpinning Safeway sign
- Slot cut final stage of excavation
- Import, place and compact ~4,100MT of structural backfill
- Reinstate utilities and Carpark
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more3619 - 3681 Arbutus Street
Matcon successfully navigated unique challenges, including Vancouver's winter weather and absorbent sandy soils, to complete bulk excavation and shoring, managing running groundwater and implementing face-saving measures within budget and on time.
Learn moreSeymour Village Phase 6
Matcon successfully executed excavation and shoring for the Seymour Village Phase 6 residential project, navigating challenges near active townhome communities with a focus on safety and minimal neighborhood impact.
Learn more