Working with fill-site owner to develop an On-site Management and Handling Plan to accept and handle the material on-site in an environmentally responsible manner

- Sourcing a suitable fill site to accept material removed from Secondary Holding Pond.
- Working with fill-site owner to develop an On-site Management and Handling Plan to accept and handle the material on-site in an environmentally responsible manner.
- Load, transport and dispose of approximately 25,000 MT of material.
See similar projects

Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn more
KITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more
Oakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn more
Lumina Brentwood - 2425 Beta Ave
A dynamic project featuring the tag team efforts of our Civil and Environmental divisions.
Learn more