This was a uniquely challenging project due to it’s extremely remote nature. The Matcon team was tasked with the removal, disposal, and backfill of over 20,000m3 of contaminated soil, construction of a treatment cell and more.
- Construct 6,000 m3 Treatment Cell
- Excavate and Place 20,000 m3 Contaminated Soil
- Backfill 20,000 m3 Contaminated Soil
- Construct 2 – 1,500 sqft concrete building foundations
- Drill and Inject 1.4 Mill Kg Hydrogen Peroxide below 14 m using direct push drill rig
- Aeration of 9,000 m3 of previously contaminated soil
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more3619 - 3681 Arbutus Street
Matcon successfully navigated unique challenges, including Vancouver's winter weather and absorbent sandy soils, to complete bulk excavation and shoring, managing running groundwater and implementing face-saving measures within budget and on time.
Learn moreSeymour Village Phase 6
Matcon successfully executed excavation and shoring for the Seymour Village Phase 6 residential project, navigating challenges near active townhome communities with a focus on safety and minimal neighborhood impact.
Learn more