This was a large excavation in close proximity to an existing Skytrain Station which required over 150 truck & pony loads leaving site per day for seven months.

- 208,000 cubic meters of excavation.
- 85,000 square feet of shotcrete shoring.
- 71,000 lineal feet of conventional anchors.
- 15,000 lineal feet of injection anchors.
- 1,000 lineal feet of 4" pipe piles.
- 400 cubic meters of rock removal.
- installation and maintenance of mechanical truck wash including 12 months of siltation and sediment control.
- 118,000 square feet of slab preparation.
- 14,000 metric tonnes of underslab backfill.
See similar projects

Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn more
KITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more
Slate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn more
King George Hub Phase D
Matcon excelled in the excavation and shoring of the King George Hub Phase D project, overcoming challenges posed by the Abbotsford flooding events with a strategic contingency plan for on-time and within-budget delivery.
Learn more