A multidisciplinary project requiring demolition, excavation and deep foundation all while protecting existing infrastructure and a vital transit corridor.
- 100,000 cubic meters of excavation.
- 20,000 square feet of shotcrete.
- 16,000 lineal feet of conventional anchors.
- 26,000 square feet of poly & mesh.
- 80,000 square feet of slab preparation.
- work below existing King George Skytrain Station.
- demolition of existing hotel.
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreSlate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn moreKing George Hub Phase D
Matcon excelled in the excavation and shoring of the King George Hub Phase D project, overcoming challenges posed by the Abbotsford flooding events with a strategic contingency plan for on-time and within-budget delivery.