Matcon was retained to offer perform environemntal servicing as part of the Faro Mine remediation project.
- Clear and grub 8,200m2 pipeline corridor
- Excavate 1,300m3 unsuitable bedding material
- Screen, haul, place and compact 12,000m3 select fill
- Install manhole and vacuum breaker
- Install 75 lin m pipe culvert
- Install 825lin m 12” insulated HDPE pipe with insulation joint kits
- Install lock block pipe anchors
- Post installation pressure testing of HDPE pipeline
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more3619 - 3681 Arbutus Street
Matcon successfully navigated unique challenges, including Vancouver's winter weather and absorbent sandy soils, to complete bulk excavation and shoring, managing running groundwater and implementing face-saving measures within budget and on time.
Learn moreSeymour Village Phase 6
Matcon successfully executed excavation and shoring for the Seymour Village Phase 6 residential project, navigating challenges near active townhome communities with a focus on safety and minimal neighborhood impact.
Learn more