A fun project requiring the expertise of our deep foundations and excavation divisions to service this lot for pre-development.


- 28,000 square feet of jet grouting.
- 325 reinforced jet grout columns.
- 11,000 lineal feet of jet grout drilling.
- 20,000 cubic meters of excavation.
- Staged excavation to accomodate dewatering in quadrants.
- 1,700 lineal feet of shotcrete waler.
- 14,000 lineal feet of injection anchors.
- 5,300 lineal feet of Tube-A-Machettes.
- Installation of inclinometers and pneumatic piezometers.
- Cut-off and disposal of over 1400 timber piles used for soil densification.
- Ongoing site remediation and soil segregation during all work.
See similar projects

Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn more
KITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more
Slate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn more
King George Hub Phase D
Matcon excelled in the excavation and shoring of the King George Hub Phase D project, overcoming challenges posed by the Abbotsford flooding events with a strategic contingency plan for on-time and within-budget delivery.
Learn more