An intricate project for one of the tallest skyscrapers in Surrey, this lot required precision excavation to avoid geothermal strutures all while moving around a fully operable skytrain structures.
- 55,000 cubic meters of excavation.
- 30,800 square feet of zero clear shotcrete.
- 10,500 square feet of underpinning.
- 29,400 lineal feet of conventional anchors.
- 8,600 lineal feet of #14 anchors drilled with a hydraulic cased drill to avoid adjacent geothermal structures.
- All work was completed adjacent to the SkyTrain structures.
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreSlate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn moreKing George Hub Phase D
Matcon excelled in the excavation and shoring of the King George Hub Phase D project, overcoming challenges posed by the Abbotsford flooding events with a strategic contingency plan for on-time and within-budget delivery.
Learn more