Situated along a busy corridor, this site required extensive excavation and remediation efforts before any pre-development slab work could commence.
- Bulk/Detail Excavation of 70,000m3 of soils
- Remediation of contaminated soils
- Installation of 3,500’ of 4” Pipe Piles
- Installation of 55,000sf of Shotcrete shoring & 40,000ft of tieback anchors
- Backfilling of adjacent park area with 13,000m3 of native material form the excavation
- Installation of precast barrels and drain tile
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more3619 - 3681 Arbutus Street
Matcon successfully navigated unique challenges, including Vancouver's winter weather and absorbent sandy soils, to complete bulk excavation and shoring, managing running groundwater and implementing face-saving measures within budget and on time.