1550 West 75th Avenue

Tasked to perform trenching, manhole and well head installation and the ongoing monitoring and maintainence of field systems.

client
Keystone Environmental
client
location
Vancouver
Budget
$
  • installation of a concrete pad and biosparge trailer
  • 300 lineal meters of trenching
  • installation of 25mm HDPE piping
  • HDPE pipe field welds and pressure testing
  • installation of manholes and well heads
  • connection of acid injection and biosparging piping to well heads
  • acid injection
  • monitoring and system maintenance