Tasked to perform trenching, manhole and well head installation and the ongoing monitoring and maintainence of field systems.
- installation of a concrete pad and biosparge trailer
- 300 lineal meters of trenching
- installation of 25mm HDPE piping
- HDPE pipe field welds and pressure testing
- installation of manholes and well heads
- connection of acid injection and biosparging piping to well heads
- acid injection
- monitoring and system maintenance
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreOakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn moreLumina Brentwood - 2425 Beta Ave
A dynamic project featuring the tag team efforts of our Civil and Environmental divisions.
Learn more