- Installation and commissioning of a bio-sparging system including compressors, oxygen enrichment system, and flow control/actuator system to meter, cycle and direct oxygen across five banks of multiplie bio-sparging wells.
- Connection of bio-sparge piping to over 40 bio-sparging wells.
- System operation and maintenance.
- Completion of three distinct acetic acid / epsom salt amendment addition programs involving the additions of 240,000 L of acetic acid and 20,000 kg of Epsom salts per program.
- Completion of one low-flow (<5L/min/well) groundwater pumping and disposal event comprising of the removal of approximately 200,000 L of water to flush amendments between wells.
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn moreOakridge Park
An incredible opportunity to bring our expertise in demolition and excavation to such a landmark project in Vancouver.
Learn moreLumina Brentwood - 2425 Beta Ave
A dynamic project featuring the tag team efforts of our Civil and Environmental divisions.
Learn more