Tasked with the removal of hazardous materials from the 10-storey mixed use building and demolish the concrete precast structure in preparation for redevelopment.

client
Ledcor Construction Ltd.
client
location
Vancouver
Budget
$

Matcon has been contracted to remove all hazardous materials from the 10-storey mixed use building and demolish the concrete precast structure in preparation for redevelopment:

  • Over $1M in hazardous materials abetment and disposal
  • More than 1,200 crane picks to disassemble the building
  • Strip out 3+ floors of office/residential space
  • Work in cooperation with Matcon Excavation and Shoring for all below grade demolition
  • Coordination of over 50 subcontractors
  • Obtained a variance to commence soft demolition concurrent with abatement activities
  • With over 85,000 manhours, no lost-time accidents occurred
  • Bulk/Detail excavation of 25,000m3 of soils
  • Installation of 30,000sf of Shotcrete shoring & 20,000ft of tieback anchors