Extensive management of the works was required due to the site being located within an existing operational healthcare campus.
- Bulk/Detail Excavation of 82,000m3 of soils
- Installation of 550’ of 4” Pipe Piles
- Installation of 37,000sf of Shotcrete shoring & 32,000ft of tieback anchors
- Detail Backfill and Slab preparation
- Installation 2,750ft of #18 DCP Micropiles
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more3619 - 3681 Arbutus Street
Matcon successfully navigated unique challenges, including Vancouver's winter weather and absorbent sandy soils, to complete bulk excavation and shoring, managing running groundwater and implementing face-saving measures within budget and on time.
Learn more