Extensive management of the works was required due to the site being located within an existing operational healthcare campus.

client
Bird Construction Ltd.
client

location
New Westminister
Budget
$
- Bulk/Detail Excavation of 82,000m3 of soils
- Installation of 550’ of 4” Pipe Piles
- Installation of 37,000sf of Shotcrete shoring & 32,000ft of tieback anchors
- Detail Backfill and Slab preparation
- Installation 2,750ft of #18 DCP Micropiles
See similar projects

Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn more

KITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more
Slate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn more