The demolition team was retained to remove an existing theatre and food court as well as manage and handle contaminated soil and asbestos abatement.
Multi-phase 80,000 square foot project in an active mall including:
- demolition of an existing theatre on the second floor
- demolition of an existing food court on the ground floor
- strip out
- structural upgrades
- asbestos abatement
- LEED