Structural fill, excavation and pre-development managament for Haven, a new townhouse development by Boffo Properties

• Excavation and removal of topsoil and peat
• Import structural fill and preload, preload removal
• Storm sewers including flow control manhole and outfall head wall to creek.
• Lock block walls
• Sanitary sewers including forcemain to offsite connection point
• Watermains and building connections
• BC Hydro, Telus, and Shaw conduits
• Roads, curbs, asphalt
See similar projects

Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn more

KITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more
Slate
Matcon successfully executed bulk excavation and shoring for a residential tower in Burnaby, with unique challenges posed by its adjacency to the Millennium Line Skytrain.
Learn more