Structural fill, excavation and pre-development managament for Haven, a new townhouse development by Boffo Properties
• Excavation and removal of topsoil and peat
• Import structural fill and preload, preload removal
• Storm sewers including flow control manhole and outfall head wall to creek.
• Lock block walls
• Sanitary sewers including forcemain to offsite connection point
• Watermains and building connections
• BC Hydro, Telus, and Shaw conduits
• Roads, curbs, asphalt
See similar projects
Brightside Phases 1 and 3
The project involved various complex tasks such as drilling and installation of cased secant piles, excavation and offsite disposal of soil, installation of tie-back anchors, and shotcrete wall construction.
Learn moreKITS BLOCK - 1981 Macdonald Street, Vancouver
Matcon successfully completed bulk excavation, disposal of contaminated soils, and extensive shotcrete shoring, overcoming challenges posed by hard sandstone with dedicated overtime efforts to maintain the project schedule.
Learn more3619 - 3681 Arbutus Street
Matcon successfully navigated unique challenges, including Vancouver's winter weather and absorbent sandy soils, to complete bulk excavation and shoring, managing running groundwater and implementing face-saving measures within budget and on time.
Learn more